What Should Be Confirmed Before Mass Production?
Mass production turns decisions into thousands of identical pieces. Confirm these six points - specification, samples, packaging, schedule, QC and logistics - before the line starts.

The moment mass production starts, changes stop being changes and become defects. Whatever the product - plush, drinkware, bags or acrylic - the same short list of confirmations protects the project. Going through it takes an hour; skipping it can cost the whole run.
1. The approved specification
One document that states dimensions, materials, colors with references, logo placement and finish - and that all parties have signed or confirmed in writing. Verbal agreements do not survive contact with a production schedule.
2. The golden sample
The approved sample is the physical standard. Confirm both sides hold an identical reference sample, and that quality inspection will compare production pieces against it - not against memory.
3. Packaging confirmed with the product
Individual boxes, inserts, outer cartons, shipping marks. Product and packaging should be confirmed together so nothing is designed into a box that no longer fits.
4. Schedule with checkpoints
Confirm production start, mid-line inspection, final inspection and ship date - and what happens if any checkpoint slips. A schedule without contingencies is a hope, not a plan.
5. Quality standards and defect handling
Agree what counts as a defect, the acceptable quality level, and how rejected pieces are handled. When quality expectations are written down, they are met far more often.
6. Logistics and documents
Shipping method, delivery address, import documents and who handles customs. The product is not done when it leaves the line - it is done when it arrives where it needs to be.